¿Habla español? Empleos en español
Español 317-773-5699 Call
Family owned since 1970

Plastic injection molding in Noblesville

We are Burco Molding, a family-owned molder with injection molding machines from 90 to 950 tons, our own tool room and an ISO 9001:2015 certified quality system. We are hiring now, and we quote new molds and production runs.

Call 317-773-5699. Información en español

  • 1970Founded by the Burrow family, still family owned
  • 19Injection molding machines, 90 to 950 tons
  • 10tonOverhead cranes for setting large molds
  • 2xEvery part inspected at least twice
Now hiring

Jobs open now in Noblesville

Done with retail? Production work here means a set shift, steady hands-on work, and no customers to deal with. If you like doing a job right, the same careful way every time, we want to hear from you.

Production jobs

General application

$16.00 an hour day shift

$16.25 an hour second shift

One application for every production opening. Our HR team keeps it on file and calls you for next steps, usually within 48 hours.

Fill out the general application
Posted on Indeed

Maintenance and grounds technician

$17 to $22 an hour 40 hours a week

Keep the plant, its equipment and its grounds in working order: preventive maintenance, basic repairs, and help with machine setup.

Apply on Indeed Read the job

This carries your name, phone and shift to the general application.

The work

What a production job is like

Operators take finished parts out of the injection molding machine, inspect them, trim them and package them. You move to a different machine now and then, so the parts and the work change. Operators report to a floor supervisor, and floor supervisors report to the plant manager.

The plant is climate controlled. You wear closed-toe shoes, and lifting is up to 50 pounds. You never deal with customers, because the office and shipping handle that, so your shift is about the machine, the parts and doing each step right.

  • Day shift 8:00 a.m. to 4:30 p.m., $16.00 an hour
  • Second shift 4:00 p.m. to 12:30 a.m., $16.25 an hour
  • Dental, vision and life insurance, plus medical you can add
  • Paid vacation for full-time employees after the first year, and six paid holidays a year
  • Direct deposit for your paycheck
  • Employees who demonstrate consistent results, initiative, and readiness for the next role will be considered for advancement opportunities

Everything about working here

A Burco operator in work gloves trimming and inspecting white plastic parts at a packing table beside a yellow injection molding machine
On the floor Every part gets a close look. Operators trim and inspect each piece right beside the machine, and every part is checked at least twice, once in production and once at packing.
Two Burco operators at a bagging line beside a yellow injection molding machine, one trimming parts and one sealing bags
Side by side Two operators work the line beside a yellow injection molding machine, one trimming parts and one bagging them. The rhythm is steady: take the part out, check it, trim it, pack it.
Who does well here

Enjoy this kind of work? This is your place

People who do well here like to focus, like things done in order, and take pride in a part that comes out right. Whether you are leaving retail or going back to work after time at home, a set shift and steady work may be what you are looking for.

Spanish speakers are welcome; there are translators at the plant. You can fill out the general application on a phone in about two minutes.

The plant

Inside our plant

The tool room is part of the plant. It is equipped to build, modify and maintain injection molds, with CNC mills, EDM, wire, manual mills and lathes, surface grinders and radial drill presses, under a 3-ton bridge crane.

The tool room under its yellow 3-ton bridge crane, with mills and benches below
Tool room Where we build, change and maintain our own molds, under a yellow 3-ton bridge crane.
An operator working at injection molding machine 32, a white and yellow Mitsubishi, on the Burco floor
Machine 32 An operator tends machine 32, one of our injection molding machines from 90 to 950 tons.
A manual vertical milling machine with a digital readout in the tool room
Mills and readouts Manual mills with digital readouts, used to repair and change molds right here in the building.
How a part gets made

From a file to the dock, under one roof

Mold building, molding, inspection, packing and shipping all happen in our plant on Herriman Boulevard, and we work on the design with you and our partners. Here is the path every part takes.

  1. 01

    Design

    Parts are drawn in SolidWorks, and Mastercam writes the CNC tool paths.

  2. 02

    Mold build

    The tool room builds, changes and maintains the molds.

  3. 03

    Molding

    Our injection molding machines run day and second shift.

  4. 04

    Trim and inspect

    Operators trim each part and inspect it at the machine.

  5. 05

    Pack

    Every part is inspected again at packing, then boxed for shipping.

  6. 06

    Ship

    Out through four docks, or on our own truck within 50 miles.

Because the tool room and the machines share one building, a mold that needs a change goes from the machine to the tool room bench and back without leaving the plant. To start a project, request a quote or email info@burco-molding.com.

A large white injection molding machine with a yellow guard door, dryer and loader beside it, under the bridge crane
Big parts One of the large machines, with its own resin dryer and loader beside it. Large parts and small ones are molded on the same floor.
Molding

Injection molding from 90 to 950 tons

We run injection molding machines from 90 to 950 tons. That range covers small parts and large ones on the same floor, with molds built and maintained in our own tool room and set by overhead cranes rated to 10 tons.

We are ISO 9001:2015 certified and go through an ISO audit every year. Every part is inspected at least twice, once in production and once during packaging, and finished work leaves from four docks or on our own truck within 50 miles.

Quotes

Tell us about your project

Send your name, phone number, email and a description of the project. Every job is different, so we follow up to talk it through. Requests go to info@burco-molding.com.

Request a quote
Videos

See inside Burco Molding

Our injection molding machines, a full tool room and the people who keep both running. Here is a short look at a working day on the floor. Follow us on Facebook.

The floor in motion Rows of injection molding machines, an operator at work, and a mill throwing chips in the tool room.

Trim and inspect Gloved hands trim and check each part before it is packed. Careful, steady work, done the same way every time.

Questions

Questions people ask about Burco Molding

Answers about jobs, pay and molding, straight from us. Call 317-773-5699 with anything else; the office is open 8:00 a.m. to 5:00 p.m.

More buyer questions

What does a production operator do at Burco Molding?

Production operators take finished parts out of the injection molding machine, inspect them, trim them and package them. Operators move to a different machine now and then. The full job is on the production operator page.

What are the shift times at Burco?

Day shift runs 8:00 a.m. to 4:30 p.m. Second shift runs 4:00 p.m. to 12:30 a.m. The office is open 8:00 a.m. to 5:00 p.m.

How much does a production job at Burco pay?

$16.00 an hour on day shift and $16.25 an hour on second shift. Dental, vision and life insurance, with medical insurance you can add for yourself. Paid vacation for full-time employees after the first year (5 days, then 10 after two years and 15 after ten), and six paid holidays a year. Bonuses are based on merit, and direct deposit is available.

How do people move up here?

Employees who demonstrate consistent results, initiative, and readiness for the next role will be considered for advancement opportunities. Fill out the general application and our HR team will call you, usually within 48 hours.

How much does an injection mold cost?

We quote each mold from your part file instead of publishing a price list. The cost follows the tool your volume needs: we build single-cavity, family and multi-cavity molds, and we produce tooling for both low and high volume production runs. Use the quote form to get a real number.

How big a part can you mold?

We run 19 injection molding machines, from 90 to 950 tons of clamp force. Our overhead cranes lift molds of up to 10 tons. The large part guide explains what those numbers mean for your part.

Are you ISO certified?

Yes. We are ISO 9001:2015 certified, registered by Verisys Registrars since 2004, and we inspect every part at least twice, once in production and once during packaging.

What do you need from me for a quote?

Your name, phone number and email, and a description of the project. A STEP file helps once the conversation gets to the part itself.

Find us

Burco Molding in Noblesville

We are at 15015 Herriman Blvd., Noblesville, IN 46060. Call 317-773-5699. The office is open 8:00 a.m. to 5:00 p.m., and the production floor runs a day shift and a second shift that ends at 12:30 a.m.

Email info@burco-molding.com for quotes and general questions, and hr@burco-molding.com about jobs. We are on Herriman Boulevard in Noblesville, in Hamilton County, and our company was founded in 1970 by the Burrow family. Truck drivers can call ahead; there are four docks and three drop trailer sites.

Open the address in Google Maps

Blue Mitsubishi injection molding machine under the painted Burco Molding Inc. wall sign, hopper and dryer at right
Noblesville, Indiana Our blue Mitsubishi injection molding machine under the painted Burco Molding Inc. sign on Herriman Boulevard. Family owned since 1970.
Explore jobsRequest a quote